Whose calendar is the real critical path?

The dependency arithmetic says two tasks can run in parallel. The owner column says they are the same person. Plans slip on that collision more often than on any estimate, and this analysis finds it before the commitment is made.

Words on this sheet

  • Predecessors: The tasks that have to finish before this one can start. Put their IDs here, separated by commas, and leave it blank when nothing has to come first.

Work Starter Resource Load Pro engine

After you install, this is the model to open.

Is Anyone Double-Booked?

  1. In your spreadsheet, click the Sortia icon in the strip of icons down the right-hand edge. No strip? Click the arrow at the bottom-right to open it. You can also use Extensions, then Sortia, then Open Sortia.
  2. Click Start from a template and put that name in the search box.
  3. Pick the card with that name and click Load this template. It arrives on a new tab with real numbers already in it.

This one runs on a Pro engine, and every free install includes five full-quality runs on your own numbers, shared across all five Pro engines rather than five for each. After that, Pro is $199/year.

The answer

Load at the early-start schedule:

Maya, peak
2 tasks at once
Double-booked
7 days straight
Maya, load
19 of 15 days
Everyone else
clear

Maya peaks at 2 parallel tasks for 7 straight days, with 19 days of work against a 15-day project. The date slips there before it slips anywhere else. Reassign the dashboard, or accept the serial schedule and move the date now, while it is still a planning decision instead of an apology.

The model

Five tasks. The pipeline and the dashboard can run in parallel by the dependencies, and both belong to Maya.

Discovery4 days · Maya
Data pipeline8 days · Maya
Dashboard build7 days · Maya (parallel)
API integration6 days · Sam
Review and ship3 days · Priya

Once it is in your sheet

  1. The model arrives with real numbers in it and runs as it stands, so you can press the button first and understand it second.
  2. Change the numbers to yours. The sheet marks which cells are inputs and which hold formulas, and most labels carry a note explaining the row.