Which risks actually deserve the money?

A worry list becomes a register when every risk carries a probability and an impact. Then the useful question appears: which mitigations actually pay for themselves, and which just feel responsible?

Operations Intermediate Risk Register Pro engine

After you install, this is the model to open.

Project Risk Register, Priced

  1. In your spreadsheet, click the Sortia icon in the strip of icons down the right-hand edge. No strip? Click the arrow at the bottom-right to open it. You can also use Extensions, then Sortia, then Open Sortia.
  2. Click Start from a template and put that name in the search box.
  3. Pick the card with that name and click Load this template. It arrives on a new tab with real numbers already in it.

This one runs on a Pro engine, and every free install includes five full-quality runs on your own numbers, shared across all five Pro engines rather than five for each. After that, Pro is $199/year.

The answer

Exposure, and what mitigating buys:

Total exposure
$112K expected
After mitigations
$41K
Best mitigation
+$12K vendor clause
Worst
−$5K migration insurance

Total expected exposure is $112,000, and the listed mitigations cut it to $41,000. The net-value column is the honest part: the vendor penalty clause is worth +$12,000 in expectation, while the $20,000 migration insurance removes only $15,000 of exposure. It costs more than the disease. Swap in your own risks; the register accepts probabilities as 0.4 or 40.

The model

Four risks, each with a probability, an impact, and a priced mitigation.

Key engineer leaves20% × $150K
Vendor slips a month40% × $80K
Scope grows mid-build50% × $60K
Data migration fails10% × $200K
Mitigationspriced against exposure

Once it is in your sheet

  1. The model arrives with real numbers in it and runs as it stands, so you can press the button first and understand it second.
  2. Change the numbers to yours. The sheet marks which cells are inputs and which hold formulas, and most labels carry a note explaining the row.
  3. Press the run button at the bottom of the panel. It is labeled for the tool you are in, and the result lands on its own tab, with a written reading of it beside the figures.

Never used Google Sheets? Start here goes the whole way, in seven steps, and assumes nothing.