How many survey responses do you actually need?

Before you send a survey, you need one number: how many completed responses make the result trustworthy. This planner computes it from your population size, confidence level, and margin of error, then reveals the counterintuitive part: a population twenty times larger needs barely any extra responses.

Analytics Starter Data Table free

After you install, this is the model to open.

Survey Sample Size Planner

  1. In your spreadsheet, click the Sortia icon in the strip of icons down the right-hand edge. No strip? Click the arrow at the bottom-right to open it. You can also use Extensions, then Sortia, then Open Sortia.
  2. Click Start from a template and put that name in the search box.
  3. Pick the card with that name and click Load this template. It arrives on a new tab with real numbers already in it.

The answer

With the defaults (5,000 people, 95% confidence, ±5% margin), the sheet returns:

Responses needed
357 for a population of 5,000 at ±5%
Invitations to send
1,190 at a 30% response rate
Needed at 100,000 people
383 only 26 more responses
Needed at ±3% margin
880 precision costs more than population

For a population of 5,000, you need 357 completed responses to report a result at 95% confidence within ±5%. Grow the population to 100,000 and the requirement rises to just 383, because sample size is driven by precision, not population. Tighten the margin to ±3% and the requirement jumps to 880. Plan invitations, not just responses: at a 30% response rate you should send about 1,190.

The model

Five inputs drive the two textbook sample-size formulas, the exact Cochran calculation with a finite-population correction and the Yamane shortcut as a sanity check.

Population size5,000 people
Confidence level95% (z = 1.96)
Margin of error±5%
Expected answer split50 / 50 (safest assumption)
Survey response rate30%

Once it is in your sheet

  1. The model arrives with real numbers in it and runs as it stands, so you can press the button first and understand it second.
  2. Change the numbers to yours. The sheet marks which cells are inputs and which hold formulas, and most labels carry a note explaining the row.
  3. Press the run button at the bottom of the panel. It is labeled for the tool you are in, and the result lands on its own tab, with a written reading of it beside the figures.

Never used Google Sheets? Start here goes the whole way, in seven steps, and assumes nothing.